Below are Dairyland Power Cooperative’s interconnection guidelines and applications for distribution substation interconnections and generation interconnections to the Dairyland Power Cooperative transmission system.
- Distribution Substation Interconnection Form
- Transmission to Distribution End-User Interconnection Guidelines for the Dairyland Power Cooperative Transmission System
- Transmission to Transmission Interconnection Guidelines for the Dairyland Power Cooperative Transmission System
- Generation Interconnection Guidelines for the Dairyland Power Cooperative Transmission System
Please download the appropriate form and email (preferred) or mail the completed form to:
Manager, Transmission & Operations Planning
Operations Division
Dairyland Power Cooperative
3200 East Ave., S.
La Crosse, WI 54602-0817
For questions or inquiries related to these applications, contact Dairyland at 608-787-1229.