Interconnection Guidelines and Forms
Interconnection Guidelines and Forms
Below are Dairyland Power Cooperative’s interconnection guidelines and applications for distribution substation interconnections and generation interconnections to the Dairyland Power Cooperative transmission system.
- Distribution Substation Interconnection Form
- Transmission to Distribution End-User Interconnection Guidelines for the Dairyland Power Cooperative Transmission System
- Transmission to Transmission Interconnection Guidelines for the Dairyland Power Cooperative Transmission System
- Generation Interconnection Guidelines for the Dairyland Power Cooperative Transmission System
Please download the appropriate form and email (preferred) or mail the completed form to:
Supervisor, Transmission Planning
Operations Division
Dairyland Power Cooperative
3200 East Ave. S.
La Crosse, WI 54602-0817
For questions or inquiries related to these applications please contact Dairyland at (608)787-1229.