Below are Dairyland Power Cooperative’s interconnection guidelines and applications for distribution substation interconnections and generation interconnections to the Dairyland Power Cooperative transmission system.

Please download the appropriate form and email (preferred) or mail the completed form to:

Manager, Transmission & Operations Planning
Operations Division
Dairyland Power Cooperative
3200 East Ave., S.
La Crosse, WI 54602-0817

For questions or inquiries related to these applications, contact Dairyland at 608-787-1229.