Title
Alma Station #1-5 Decommissioning

alma 1-5 demoIn 2017, Dairyland’s Generation Engineering group oversaw the permanent removal of smaller outbuildings and conveyors, as well as the removal of underground coal tunnels, sealing of the cooling water intake structure and the removal of regulated materials. The last remaining section of Dairyland’s main Alma Station building was brought down on Oct. 17, 2017.