Project Status: Approved
Strategic Purpose: Asset Reliability & Diversification
Project Contact: Staci Pieper
Related Resources: Map
North Wal Tap Line
Dairyland Power Cooperative is building a one-mile, double-circuited 69,000-volt transmission line from an interconnection point on Dairyland's existing Centerville-to-Independence transmission line. The purpose of the transmission line is to deliver electricity to Riverland Energy Cooperative's new Tamarack Distribution Substation, which will be located on Trowbridge Lane in Trempealeau County, Wis. The new transmission line and substation will increase local distribution capacity and improve system reliability for Riverland Energy cooperative members in this service territory.
Project At A Glance |
|
---|---|
County where facilities may be placed | Barron County (Wis.) |
Distribution Cooperative Service Territory |
|
Line length | 0.7 miles |
Voltage | 69 kV |
Estimated project cost | |
End points | Existing Xcel 69 kV transmission line to the proposed Barron Electric Cooperative North Wal distribution substation |
69 kV Transmission Line
![69 kV Transmission Line](/sites/default/files/inline-images/69%20kV%20-%20MPeters%20-%20sm_2.jpg)
Schedule
|
|
---|---|
Right-of-way acquisition | |
Start of construction (right-of-way clearing) | |
Foundations, structures, line construction | |
Target in-service date |