​​​Project Status: Approved
Strategic Purpose: Asset Reliability & Diversification
Project Contact: Staci Pieper
Related Resources:
Map

 

North Wal Tap Line

Dairyland Power Cooperative is building a one-mile, double-circuited 69,000-volt transmission line from an interconnection point on Dairyland's existing Centerville-to-Independence transmission line. The purpose of the transmission line is to deliver electricity to Riverland Energy Cooperative's new Tamarack Distribution Substation, which will be located on Trowbridge Lane in Trempealeau County, Wis. The new transmission line and substation will increase local distribution capacity and improve system reliability for Riverland Energy cooperative members in this service territory.

Project At A Glance

County where facilities may be placed Barron County (Wis.)
Distribution Cooperative Service Territory  

Barron   

Line length 0.7 miles
Voltage 69 kV
Estimated project cost  
End points Existing Xcel 69 kV transmission line to the proposed Barron Electric Cooperative North Wal distribution substation

 69 kV Transmission Line

69 kV Transmission Line

 

Schedule
(dates are anticipated and subject to change)

Right-of-way acquisition  
Start of construction (right-of-way clearing)  
Foundations, structures, line construction  
Target in-service date