Project Status: CONSTRUCTION IN PROGRESS
Strategic Purpose: Cooperative Purpose
Project Contact: Eric Dummer
Related Resource(s): Map
Tamarack Substation Tap Line
Dairyland Power Cooperative is building a one-mile double circuited 69,000-volt transmission line from an interconnection point on Dairyland's existing Centerville to Independence transmission line. The purpose of the transmission line is to deliver electricity to Riverland Energy's new Tamarack Distribution Substation, which will be located on Trowbridge Lane in Trempealeau County, Wisconsin. The new transmission line and substation will increase local distribution capacity and improve system reliability for Riverland cooperative members in this service territory.
Project At A Glance |
|
---|---|
County where facilities may be placed | Trempealeau County (Wis.) |
Distribution Cooperative Service Territories | |
Line length | 1 mile |
Voltage | 69 kV |
Estimated project cost | |
End points | Dairyland's existing 69 kV transmission line to Riverland Energy Tamarack Distribution Substation |
Schedule (all dates are anticipated and subject to change) |
|
---|---|
Right-of-way acquisition | |
Start of construction (right-of-way clearing) | |
Foundations, structures, line construction | |
Target in-service date |