Project Status: CONSTRUCTION IN PROGRESS
Strategic Purpose:
Cooperative Purpose
Project Contact: Eric Dummer 
Related Resource(s): Map

Tamarack Substation Tap Line

Dairyland Power Cooperative is building a one-mile double circuited 69,000-volt transmission line from an interconnection point on Dairyland's existing Centerville to Independence transmission line. The purpose of the transmission line is to deliver electricity to Riverland Energy's new Tamarack Distribution Substation, which will be located on Trowbridge Lane in Trempealeau County, Wisconsin. The new transmission line and substation will increase local distribution capacity and improve system reliability for Riverland cooperative members in this service territory.   

Project At A Glance

County where facilities may be placed Trempealeau County (Wis.)
Distribution Cooperative Service Territories

Riverland Logo

Line length 1 mile
Voltage 69 kV
Estimated project cost  
End points Dairyland's existing 69 kV transmission line to Riverland Energy Tamarack Distribution Substation

Schedule (all dates are anticipated and subject to change)

Right-of-way acquisition  
Start of construction (right-of-way clearing)  
Foundations, structures, line construction  
Target in-service date